Double Hydraulics Patch

$ 8.00 USD

Surfing the Lower Youghiogheny. As the name implies... the first hole is a pour over ledge and the second hole is playable at the right water levels. The standard line is to catch the first eddy in river center and a second eddy further down and to the right. Sew or iron on. 4 x 2 inches. Made in the USA!

Roast Specs01

Tasting Notes02

No items found.

RIVER’S END RAPIDS
ALLEGHENY RIVER

40°06’42”N  x  79°22’55”W

We named this unique roast for one of our favorite spots on the Allegheny River. The currents are steady and consistent, fantastic for beginners.

MIN DEPTH: 03 FT
MAX DEPTH: 09 FT